Antennas
450 MHz
CDMA 450 Antenna: FREEDOM CDMA-5 400-470 MHz (with 5m cable + TNC connector)
Code: A6905
Price
Disc.
Quantity
9.89 EUR
0 %
FREEDOM CDMA-5 antenna is an indispensable device for enabling/improving advanced data services for broadband Internet access in 450 MHz band. It allows to use the services in rooms and places where the simple built-in antennas of the equipment used do not provide satisfactory results.
Distinguishing features:
- Designed for broadband Internet access in 450 MHz band (CDMA),
- Improves signal strength ensuring proper operation in low-signal environments,
- Gain up to 6dBi,
- VSWR < 1.2
- Integrated 5m cable,
- TNC connector,
- Small size allows for easy mounting in any place.
The basic antennas supplied with the equipment are often not suitable for stable operation in some regions (long distance from the base station) and some places (inside buildings). The FREEDOM CDMA-5 antenna improves signal strength ensuring proper operation in low-signal environments and stable access to the Internet. The antenna integrates 5m coaxial cable with TNC connector.
Used even inside a building and directed towards the base station, the antenna limits the harmful energy that is dissipated inside the room.
Used even inside a building and directed towards the base station, the antenna limits the harmful energy that is dissipated inside the room.
- Poland
- MV411, MV410, MV410LR, MV400 (from Axesstel, Orange Freedom Pro service)
Specifications
| Name | FREEDOM CDMA-5/450MHz |
| Code | A6905 |
| Band [MHz] | 400-470 |
| Gain [dBi] | 6 |
| VSWR | <1.2 |
| Front/back ratio [dB] | ≥12 |
| Polarization | V |
| Number of elements | 5 |
| Output impedance [Ω] | 50 |
| Packaging | foil |
| Weight [kg] | 0.53 |
| Length [m] | 0.57 |
| Beamwidth - H [o] | 60-68 |
| Beamwidth - V [o] | 90-110 |
| Length of integrated cable [m] | 5 |
| Connector (on the cable) | TNC |

Gain versus frequency

SWR versus frequency
Price
Disc.
Quantity
9.89 EUR
0 %
COMPLETE WITH
SECTION LIBRARY
LIBRARY NEW TITLES
TO KNOW MORE
On January the 19th, 2008, at twelve noon, there was official opening and presentation of Video Monitoring Center in the Police Headquarters in Myslenice. The city... more »












